Project details

Full FRP Chminey liner, FDG process, transportation of gasses

CustomerThe Israelic Electric Corporation Ltd.
LocationHadera, Israel
Project executed on2012
Market segmentPower
Technical specification
Pressure+/- 400 Pa
MeasurementsDiameter: 7,000 mm High of Stack: 200 meter
MediumFlue gas
MaterialGRP CBL
TemperatureDesign Temperature: + 80° C

Project description

The client, Israel Electric Company (IEC), selected Plasticon Composites as an experienced partner for the design, fabrication with the On Site Winding Machine no. 3 (OSWM-3), supply and installation of this project. The project was awarded by Plasticon North America Inc. Member of the Plasticon Composites group.

IEC’s chimney was constructed on Orot Rabin Power Station Site. The power station is located close to Hadera town along the Mediterranean seashore in Israel. The plant includes two existing coal-fired power stations. The flue gas desulfurization (FGD) absorber was based on wet limestone technology producing commercial quality gypsum as by product. From the absorber the flue gas is carried to one new 250 m concrete chimney equipped with two FRP liners, one liner for each generating unit. The existing 300 m concrete chimney equipped with one common liner for both units, act as the hot by-pass stack for some years and was dismantled later.

The liner is a 200m Ø 7m cylinder, beginning at elevation 80 m at the liner expansion joint upper flange and ending at elevation 250 m, it is supported 50m under the top of the chimney, at elevation 200 m, and deflected with the concrete chimney. The supply of recirculation piping systems was included in the scope of the project as well.