Projects

Staythorpe Power Station - Pipework Installation

CCGT Power Station, Staythorpe, United Kingdom, Power,
This project included the installation, jointing and on site testing of cooling water pipes, with an 18 month site programme and a peak of 25 men were utilised on the project. These cooling  water pipes are used at a CCGT Power station at Newark in Nottinghamshire,...

» Read more

Staythorpe Power Station, pipework installation

Isle of Grain - Pipework Installation

CCGT Power Station, Isle of Grain, United Kingdom, Power,
These GRP cooling water pipes were installed, jointed and tested on site for a CCGT Power station, which is located at the Isle of Grain in Kent. The pipework varies from 25NB to 2000NB. This projected was fulfilled in a 30 months site programme. On a peak, 60 men were working on it.

» Read more

Isle of Grain Pipework Installation

Eggborough 2 stack liners

Brittish Energy, Eggborough, UK, Power,
British Energy installed a flue gas desulphurization (FGD) system at its existing power plant in Eggborough and realized that the existing brick liner would not be able to withstand the chemical attack and temperature increase. For the first time in the...

» Read more

Eggborough cans on transport